|
|
|||||||
Camille went right over my school. The Brother said the anemometer blew off at 210. Katrina put 20+ ft all the way to the CSX tracks. CSX wanted to then build 10 miles inland. Above I 10. Someone nixed that idea. The school was rebuilt to withstand a Katrina. It and the church across the street, pews stacked on the alter was all I could recognize. The new US 90 bridge should hold. Don't know how they reworked the CSX bridge crossing Bay St Louis. A stalled Isaac in the MS/Pearl River Estuary, you might as well build a levee from River Ridge to Claiborne to I 10 to the Jackson Barracks at the industrial Canal. Give every (school, city, county) bus driver in NO a bus and tell 'em to fill 'er up and get N of the Lake. A stalled CAT 3 in the MS River Estuary, they'll either have to blow the S Levees and lose the MS or save the MS and lose NO. |