|
|
|||||||
Dirt leeves in several area are being breeched (breeches is when water flows over the top of leeve). Have not heard about any breaks in structural leeves around pump facilitys. Bay-St.Loius is now in the eye. Bilouxi will feel the eye wall pretty soon. Im waiting on a call from Bathesda Md. regarding flooding estimates up to this point. will update. |