|
|
|||||||
expecting vortex for stan shortly..... URNT11 KNHC 030520 97779 04504 21212 90518 15200 11029 17178 /2474 RMK AF304 0420A STAN OB 06 Also... saw the NOAA(43RF) P-3 Instrument Status Report on friday had: Ready to go. Early morning work tomorrow (sat) means the aircraft will not be available for flight until 11am. Aircraft will enter SIDLAM next Monday and will be grounded for several months. not sure what SIDLAM is, and if it's still a go for monday.....that would mean only one P-3 for this week and NRL plane, last i saw (friday) might have a landing gear problem...."Landing gear inspection required sometime on Friday. If inspection uncovers problems aircraft may be grounded for several days. Of remaining flight hours, 12 required for de-installation work in Boulder at the end of the project.".... and there appeared only 19.9hrs of flight time left before 50hr inspection..... (7hrs for flight time for a system) |